#austinrealestate
Waterline Tower Austin Opening: Hotel, Restaurants Coming in August
Waterline tower Austin is moving toward its first major public opening in August 2026, when the lower portion of Texas’ tallest tower is expected to bring hotel rooms, restaurants and visitor amenities to downtown Austin. The project is drawing attention because it combines two major trends shaping the city: strong downtown tourism and a still-challenging office market. What Will Open Inside Waterline Tower Austin The lower portion of Waterli
Waterline Tower Austin Opening: Hotel, Restaurants Coming in August
Waterline tower Austin is moving toward its first major public opening in August 2026, when the lower portion of Texas’ tallest tower is expected to bring hotel rooms, restaurants and visitor amenities to downtown Austin. The project is drawing attention because it combines two major trends shaping the city: strong downtown tourism and a still-challenging office market. What Will Open Inside Waterline Tower Austin The lower portion of Waterli
Manulife Acquires Tesla-Leased Facility in Texas with $32.2 Million Loan
Manulife Investment Management has successfully acquired a 183,340-square-foot Class A industrial facility in Taylor, Texas, which is fully leased by Tesla for a 10-year term. The acquisition was financed with a $32.2 million, three-year, fixed-rate loan provided by BMO. The deal was arranged by JLL, with Partners Real Estate acting as the seller. Located in the RCR Taylor Logistics Park, the warehouse is strategical
Manulife Acquires Tesla-Leased Facility in Texas with $32.2 Million Loan
Manulife Investment Management has successfully acquired a 183,340-square-foot Class A industrial facility in Taylor, Texas, which is fully leased by Tesla for a 10-year term. The acquisition was financed with a $32.2 million, three-year, fixed-rate loan provided by BMO. The deal was arranged by JLL, with Partners Real Estate acting as the seller. Located in the RCR Taylor Logistics Park, the warehouse is strategical









